Solid Engineering undertook a project at Airly Mine, to enhance the safety and efficiency of moving conveyor structure in and out of the underground coal mine. The objective was to maximize the carrying capacity and safety, while improving overall operational efficiency. To achieve this, our team designed and engineered a specialized trailer as an alternative to the conventional QDS (Quick Detachment System) structure pod commonly used in mining operations.
The decision to design and manufacture a trailer was driven by the limitations of the QDS pod, which had restricted capacity due to the limitations and stability concerns associated with Load Haul Dumpers (LHDs). By introducing a trailer that could be towed by the LHD, we could overcome stability issues and significantly increase the carrying capacity by more than double when compared to the QDS pod.
In addition to improving carrying capacity, the design of the trailer incorporated ergonomic considerations and eliminated many pinch points, enhancing overall safety. Solid Engineering manufactured two trailers as part of the project, ensuring redundancy and operational flexibility.
Throughout the project, close collaboration and frequent meetings with the client were integral to its success. We worked closely with the team at Airly Mine during the design, engineering, and manufacturing phases, seeking their input and aligning the solution with their specific requirements and operational constraints.
To ensure compliance with Australian standards and mine design guidelines, Solid Engineering provided comprehensive documentation. This documentation encompassed design specifications, engineering calculations, compliance reports, and other necessary documentation to meet regulatory requirements and industry standards. The adherence to these standards ensured the safe and compliant operation of the conveyor structure trailers within Airly Mine.
The completion of the Conveyor Structure Trailer Design and Manufacture project at Airly Mine reflects Solid Engineering’s commitment to innovation, safety, and operational efficiency. By introducing a specialized trailer, we not only improved the carrying capacity and stability but also prioritized ergonomic design and safety enhancements. Our collaboration with the client and adherence to rigorous standards further solidified our reputation for delivering reliable and compliant solutions in the mining industry.