De-Watering Containers

Solid Engineering was entrusted with the manufacturing of four De-Watering Tanks for the Snowy Hydro 2.0 tunneling project, a major infrastructure undertaking in NSW, Australia. Engaged by a third party, we embarked on a comprehensive process to transform 40′ high cube shipping containers into efficient and reliable de-watering tanks.

The project commenced with our client providing a design brief and concept sketch, which served as the foundation for our work. We then proceeded to produce detailed manufacturing drawings and enlisted the expertise of a third-party engineer to provide necessary engineering certification, ensuring compliance with industry standards.

To convert the shipping containers into de-watering tanks, we meticulously removed the timber floors, doors, and roofs of the containers. The containers were then subjected to thorough blasting to prepare them for repairs and modification works. Any necessary repairs were diligently carried out to ensure the structural integrity of the containers.

The modifications included the installation of a steel floor, a new end wall, and the implementation of substantial internal and external bracing. Additionally, eight pipe inlets/outlets were strategically incorporated into the design to facilitate efficient de-watering operations. To ensure optimal performance and longevity, non-destructive testing (NDT) was conducted to assess the integrity of the modified containers.

In line with the specific requirements of the project, we applied a specially developed protective coating system to safeguard the containers against the harsh operating conditions they would encounter. Rigorous leak testing was conducted on all the de-watering tanks to ensure their reliability and functionality.

As part of our commitment to quality and compliance, we provided a comprehensive documentation package for each de-watering container. This package included detailed records of the modifications, engineering certifications, and any relevant test results, serving as valuable references and ensuring transparency.

Solid Engineering takes great pride in delivering exceptional outcomes. Through our expertise in manufacturing and modification, we successfully transformed standard shipping containers into robust, efficient de-watering tanks for the Snowy Hydro 2.0 tunneling project. Our commitment to precision, compliance, and thorough documentation ensures that our clients receive reliable solutions that meet their specific needs.

When it comes to projects requiring innovative modifications and reliable manufacturing, Solid Engineering remains a trusted partner dedicated to providing exceptional results.