Relay Bar Repairs
Yancoal – Ashton Mine
Solid Engineering was engaged by the Longwall and Engineering teams at Yancoal’s Ashton underground coal mine to repair relay bars, a crucial component of their Longwall system. The relay bars are inspected regularly, and any requiring repairs are removed from the Longwall and replaced with previously repaired bars during each Longwall relocation.

The project encompassed several phases, starting with material analysis, weld procedure development, and welder qualifications. Once the repair method was established, the subsequent scope of work included transportation, blasting, non-destructive testing (NDT), repairs, painting, delivery back to the site, and project documentation. These activities are conducted on an ongoing basis after each Longwall relocation.
1. Material Analysis: Solid Engineering carried out a material analysis of the relay bars to determine their composition. This step guided the subsequent repair procedures and ensured the appropriate repair techniques were employed.
2. Weld Procedure Development and Welder Qualifications: The team developed weld procedures specific to the relay bar repairs, outlining the welding techniques, parameters, and quality requirements. Qualified tradespeople were then trained and certified to perform the repairs, ensuring consistency and adherence to the procedure.
3. Transport: Relay bars requiring repairs are transported from Yancoal’s Ashton underground coal mine to Solid Engineering’s facility.
4. Blasting: The relay bars undergo a meticulous blasting process to remove surface contaminants, rust, and existing coatings. This step prepares the realy bars for subsequent repair and painting procedures.
5. Non-Destructive Testing (NDT): Comprehensive NDT inspections are conducted on the relay bars to identify any internal or surface defects that could compromise their structural integrity. This critical step allows for accurate assessment and targeted repairs.
6. Repairs: Skilled tradespeople carry out the necessary repairs based on the findings from the NDT inspections. This includes welding, and replacement of damaged sections to restore the relay bars to their optimal condition.
7. Painting: Once the repairs are completed, the relay bars are painted using high-quality coatings to provide protection against corrosion and wear. This enhances their durability and longevity in the demanding underground coal mine environment.
8. Delivery and Project Documentation: The repaired relay bars are safely transported and delivered back to Yancoal’s Ashton underground coal mine. Additionally, comprehensive project documentation is provided, including repair records, quality reports, and any other required documentation.
Solid Engineering successfully executes the repair of relay bars for Yancoal’s Ashton underground coal mine. The scope of work includes material analysis, weld procedure development, welder qualifications, transportation, blasting, NDT, repairs, painting, delivery, and project documentation. By implementing rigorous quality control measures and employing skilled tradespeople, we ensure that the relay bars are restored to optimal condition, meeting the stringent requirements of the Longwall and engineering team. This ongoing work after each Longwall relocation demonstrates our commitment to providing reliable and efficient repair solutions to support the continuous operations of the Ashton underground coal mine.